Computare (AetherOS): Difference between revisions
Jump to navigation
Jump to search
AdminIsidore (talk | contribs) No edit summary |
AdminIsidore (talk | contribs) No edit summary |
||
| Line 91: | Line 91: | ||
* '''System Architecture:''' The self-learning architecture is '''stable and validated'''. The main conductor script (`praefectus_experimentum.py`) successfully orchestrates a complete design-simulate-log cycle. The system has demonstrated autonomous problem-solving by successfully diagnosing a critical flaw in its simulation toolchain (the `nodrv_CreateWindow` error with LTspice) and autonomously replacing the faulty component with the more robust `ngspice` simulator. | * '''System Architecture:''' The self-learning architecture is '''stable and validated'''. The main conductor script (`praefectus_experimentum.py`) successfully orchestrates a complete design-simulate-log cycle. The system has demonstrated autonomous problem-solving by successfully diagnosing a critical flaw in its simulation toolchain (the `nodrv_CreateWindow` error with LTspice) and autonomously replacing the faulty component with the more robust `ngspice` simulator. | ||
* '''Phase 1 Completion:''' With the successful integration and validation of the `ngspice` simulation backend, the "Digital Twin" phase is now '''complete'''. The `Fabrica` can generate a hardware design, create a valid SPICE netlist, execute a simulation, and correctly parse the results without error. The system is stable and ready for the next phase. | * '''Phase 1 Completion:''' With the successful integration and validation of the `ngspice` simulation backend, the "Digital Twin" phase is now '''complete'''. The `Fabrica` can generate a hardware design, create a valid SPICE netlist, execute a simulation, and correctly parse the results without error. The system is stable and ready for the next phase. | ||
* '''Next Steps:''' The project is officially moving into '''Phase 2: Fabrication and Calibration'''. A task has been created for '''Friday, October | * '''Next Steps:''' The project is officially moving into '''Phase 2: Fabrication and Calibration'''. A task has been created for '''Friday, October 24, 2025''', to coincide with the arrival of the new HP Workstation/GPU. The immediate focus will be on the physical manufacturing of the first prototype, beginning with the acrylic practice boards and the development of the calibration software. | ||